|
Overview: APC-MGE solutions include uninterruptible power supplies (UPS), precision cooling units, racks, and design and management software, including APC's InfraStruXure® architecture the industry's only integrated power, cooling, and management solution.
KnowledgeStorm's detailed company reports contain important information including: stock symbols, company size, addresses, and more. You may access this additional information about this company by viewing one of the detailed solution reports or research abstracts listed below
Air Distribution Architecture Options for Mission Critical Facilities by APC
November 2008 - An understanding of the 9 types of cooling systems and their attributes can be used to develop guidelines for when each type should be used, and such guidelines are provided in this paper for both raised floor and hard floor applications.
Avoidable Mistakes that Compromise Cooling Performance in Data Centers and Network Rooms by APC
November 2008 - This paper examines various typical mistakes, explains their principles, quantifies their impacts and describes simple remedies.
Creating Order from Chaos in Data Centers and Server Rooms by APC
November 2008 - This paper outlines several innovation approaches for dealing with the symptoms of chaos and for eliminating the root causes of disorder.
Data Center Projects: Growth Model by APC
November 2008 - This paper shows a simple and effective way to develop a capacity plan for a data center or network room.
Data Center Projects: Standardized Process by APC
November 2008 - This paper covers projects involving new construction or upgrades to the data center’s physical infrastructure - the power, cooling, and other physical systems that house and protect the data center’s IT equipment.
Essential Cooling System Requirements for Next Generation Data Centers by APC
November 2008 - This paper presents a categorized and prioritized collection of cooling system challenges and requirements as obtained through systematic user interviews.
Five Basic Steps for Efficient Space Organization with High Density Enclosures by APC
November 2008 - This paper provides a five-step roadmap for standardizing and optimizing organization within both low and high density enclosure, with special emphasis on how to plan for higher densities.
Hot Aisle Vs. Cold Aisle Containment by APC
November 2008 - Both hot and cold air containment can significantly improve the predictability and efficiency of data center cooling system. This paper examines both methodologies and highlights the reasons why hot aisle containment emerges as the preferred best practice.
Humidification Stratiegies for Data Centers and Network Rooms by APC
November 2008 - This paper explains the nature of humidity, its effects and its management in computer rooms and data centers.
Improving Rack Cooling Performance Using Airflow Management™ Blanking Panels by APC
November 2008 - This paper explains and quantifies the effects of airflow management blanking panels on cooling system performance.
Management Strategy for Network Critical Physical Infrastructure by APC
November 2008 - Physical infrastructure management is the key to system availability, minimizing downtime risk and increasing personnel productivity. Learn the factors that should be considered when choosing a management solution for the physical infrastructure la...
Monitoring Physical Threats in the Data Center by APC
November 2008 - This paper describes the class of threats, suggests approaches to deploying monitoring devices, and provides best practices in leveraging the collected data to reduce downtime.
Rack Powering Options for High Density by APC
November 2008 - Individual rack enclosure power consumption in the data center or network room varies widely and is expected to grow in the next few years. This paper focuses on building a power distribution center.
Re-examining the Suitability of the Raised Floor for Data Center Applications by APC
November 2008 - Many of the reasons for the raised floor in the data center no longer exist, and the problems associated with raised floors suggest that their widespread use is no longer justified or desirable for many applications
Site Selection for Mission Critical Facilities by APC
November 2008 - When selecting a new site for a data center or evaluating an existing site, it is important to understand all potential risks associated with that site. Read this white paper to learn techniques for evaluating and mitigating a site's risk factors.
Technical Comparison of On-line Vs. Line-interactive UPS Designs by APC
November 2008 - This paper describes the advantages and disadvantages of each topology and addresses some common misconceptions about real-world application requirements.
Understanding Power Factor, Crest Factor, and Surge Factor by APC
November 2008 - This paper explains the technical terms of Power Factor, Crest Factor, and Surge Factor.
|